Cut and Fill Calculator
Enter cut and fill volumes with an optional swell factor.
Result
How it is calculated
Enter the excavated (cut) volume and the fill volume in cubic metres, plus a swell or shrink percentage. The tool first applies the factor to the cut: adjusted cut = cut × (1 + swell ÷ 100), then takes net = adjusted cut − fill. A positive net is shown as a surplus (soil left over to haul away or stockpile), a negative net as a deficit (soil to import), and exactly zero as balanced. The swell box may be left empty, which counts as 0%, and a negative percentage acts as shrinkage. Cut and fill cannot be negative. The factor is applied only to the cut, not to the fill, and the same single factor is used for the whole job, regardless of soil type or compaction.
Worked example
A site needs 1,200 m³ of cut and 1,350 m³ of fill, and you assume a 20% swell. Adjusted cut = 1,200 × 1.20 = 1,440.00 m³. Net = 1,440 − 1,350 = 90, which is shown as 90.00 m³ surplus. The tool also lists the adjusted cut (1,440.00 m³) and the fill (1,350.00 m³). With no swell at all the same job would be 150.00 m³ short, so the swell assumption flips the result from a deficit to a surplus, which shows how much the factor matters.
Common mistakes
- Entering the swell as a decimal such as 0.2. The field is a percentage, so 20 means 20%; 0.2 adds almost nothing.
- Expecting the factor to be applied to the fill as well. Only the cut volume is adjusted, so if your fill figure is in a different measure (loose or compacted) convert it first.
- Entering volumes in cubic yards or cubic feet. The result is labelled m³ and no conversion is done.
- Reading a surplus as free soil. Surplus is the loose volume left after the fill demand; hauling or stockpiling it costs money, and a deficit means paying for imported material.
- Using one swell figure for several soil types. Rock, clay and sand swell by different amounts; if the cut is mixed, calculate each group separately and add the results.
About this calculator
In earthwork planning, cut is the volume of soil excavated from areas above the design grade, and fill is the volume needed to raise areas below grade up to that same level. Because excavated soil expands once it's dug up and loosened (it no longer packs as tightly as it did in the ground), engineers apply a swell factor — typically 15–30% depending on soil type — to convert bank-measure cut volume into loose (hauled) volume before comparing it against fill demand.
The calculator subtracts fill from swell-adjusted cut to get the net earthwork balance: a positive result means surplus soil that must be hauled off-site or stockpiled, while a negative result means a deficit that requires importing borrow material. This balance is a core input for grading and site-development cost estimates on roads, pads, and foundations, since trucking soil on or off a site is one of the largest line items in earthwork budgets.
Was this helpful?
You can pick up to 3 reactions.
Popular calculators
Loan Calculator
Monthly payment, total interest and full amortization schedule.
Percentage Calculator
Percent change, percent of, and ratio calculations.
Discount Calculator
Calculate final price, savings, and discount amount.
BMI Calculator
Body mass index from height and weight (metric or imperial).
Age Calculator
Compute your exact age in years, months and days from a birth date.
Compound Interest Calculator
Calculate the final amount and interest earned with compounding.
All Calculators
- Loan Calculator
- Profit Calculator
- Discount Calculator
- BMI Calculator
- Percentage Calculator
- Ideal Weight Calculator
- Age Calculator
- Pregnancy Due Date Calculator
- Compound Interest Calculator
- BMR Calculator (Basal Metabolic Rate)
- Tip Calculator
- Fuel Cost Calculator
- Date Difference Calculator
- Sleep Cycle Calculator
- Daily Water Intake Calculator
- Simple Interest Calculator
- Heart Rate Zones Calculator
- Running Pace Calculator
- Pet Age Calculator
- Calories Burned Calculator
- Macro Calculator
- TDEE Calculator (Total Daily Energy Expenditure)
- Waist-to-Hip Ratio Calculator
- Honor Roll Calculator
- One Rep Max (1RM) Calculator
- Ovulation Calculator
- Electricity Cost Calculator
- Unit Price Calculator
- Savings Goal Calculator
- Break-Even Point Calculator
- Paint Calculator
- Course Grade Average Calculator
- Business Days Calculator
- Time Duration Calculator
- Fuel Economy Calculator
- Temperature Converter
- Tile Calculator
- Aspect Ratio Calculator
- Roman Numeral Converter
- Goal Weight Timeline Calculator
- Salary Converter (Hourly to Annual)
- Credit Card Validator (Luhn)
- Body Surface Area (BSA) Calculator
- Feels-Like Temperature Calculator
- Ohm’s Law Calculator
- PPI (Pixel Density) Calculator
- Molar Mass Calculator
- Zodiac Sign Calculator (Western + Chinese)
- IBAN Validator
- Shoe Size Converter
- Country Info & Dialing Code Lookup
- Time Zone Difference (World Clock)
- CAGR (Compound Annual Growth Rate) Calculator
- Rule of 72 Calculator
- Blood Alcohol Content (BAC) Calculator
- Lean Body Mass (LBM) Calculator
- Pythagorean Theorem Calculator
- Speed Converter
- Download Time Calculator
- Date Calculator (Add/Subtract)
No calculators found
Comments (1)
The sign of the answer can hinge on one assumption. With 1,200 m³ of cut and 1,350 m³ of fill, a shrink of −10 percent gives a 270.00 m³ deficit, while a swell of 25 percent on 1,000 m³ against 1,000 m³ of fill gives a 250.00 m³ surplus. Run your swell as a low, middle and high case before pricing haulage or imported material. What soil types does your site have, and where do your swell figures come from?