Loft Boarding Cost Calculator

Boards and cost to board out your loft floor area.

How it is calculated

The tool works in square metres and metres. Board area is length × width. The number of boards is ceil(floor area × (1 + waste ÷ 100) ÷ board area), always rounded up to a whole board. Cost is boards × price per board, shown in dollars, and cost per m² is that total divided by your floor area (not the area including waste). Floor area must be above zero. The other four fields are optional: a blank one uses a default of 1.22 m × 0.32 m for the board, a price of 8 and a waste allowance of 10 %. A value you actually type is never replaced: a board length or width of zero or less, a negative price, or a waste below 0 or above 100 shows no result. A price or waste of 0 is accepted. Only boards are priced; fixings, insulation, labour and raised platforms are not included.

Worked example

The loft floor is 20 m², using 2.4 m × 0.6 m boards at 18 each with 10 % waste. One board covers 2.4 × 0.6 = 1.44 m². Area with waste: 20 × 1.10 = 22 m². Boards needed: 22 ÷ 1.44 = 15.28, rounded up to 16 boards. Cost: 16 × 18 = $288.00. Spread over the 20 m² floor, that is 288 ÷ 20 = $14.40 per m². Buying a single extra board for contingency would raise the cost by 18.

Try this example →

Common mistakes

  • Typing board sizes in millimetres or centimetres. Lengths are metres, so 2.4 and 0.6, not 2400 and 600; entering 122 and 32 gives no result, because boards longer than 6 m or wider than 1.5 m are rejected.
  • Using the full house footprint instead of the boardable area. Areas under the eaves, around the tank or beside the hatch you will not board should be left out.
  • Leaving fields blank and assuming they count as zero. A blank board size, price or waste uses a default (1.22 × 0.32 m, 8, 10 %), which may not match what you are buying; type the real figures.
  • Entering waste as a decimal, such as 0.1 for 10 %. The field is a percentage, so 0.1 means a tenth of one percent, and a value above 100 shows no result.
  • Treating the cost as the full project price. Screws, battens, raised legs for insulation depth and labour are not counted.

About this calculator

Boarding out a loft floor means covering the joists with chipboard or OSB panels to create usable storage space, and the material need is simply the attic floor area divided by the coverage area of one board, rounded up and increased by a waste allowance — typically around 10% — to account for cuts, offcuts and boards lost to fitting around obstructions like the water tank or roof timbers. Cost is then that board count multiplied by the price per board; fixings are not included, so add them separately.

Homeowners planning a loft boarding project use this calculation to get an accurate materials budget before ordering, since underestimating boards means a second trip to the merchant mid-job and overestimating ties up money in boards that never get used — and the waste allowance matters more than people expect once real obstructions are factored in.

Was this helpful?

You can pick up to 3 reactions.

Comments

  • Be the first to comment.

Popular calculators

All Calculators