How it is calculated
For a round column V = π × (d ÷ 2)² × h; for a square column V = s² × h. In both cases the single size field (dim) is the diameter or the side length, and the height and dim are in metres. The volume per column is multiplied by the count. The tool then converts: cubic yards = m³ ÷ 0.764555, and bags = ceil(m³ × 35.3146667 ÷ 0.45), assuming one 60-lb bag yields 0.45 cubic feet. Any shape value other than square is treated as round, so a rectangular column cannot be entered; for it, multiply width × depth × height yourself. No waste, spillage or over-excavation allowance is added, and every value must be above zero. Bag yields vary by brand and country, so check the label.
Worked example
Six round columns, each 0.4 m in diameter and 3 m tall. Radius = 0.2 m. One column: π × 0.2² × 3 = 0.377 m³. Six columns: 0.377 × 6 = 2.262 m³. In cubic yards: 2.262 ÷ 0.764555 = 2.959 yd³. In cubic feet: 2.262 × 35.3147 = 79.9 ft³, and 79.9 ÷ 0.45 = 177.5, rounded up to 178 bags.
Common mistakes
- Typing the diameter in centimetres (40) or the height in feet; both are metres, so 0.4 is a 40 cm column.
- Entering the radius as the size for a round column. The field expects the diameter; using 0.2 gives one quarter of the real volume.
- Using the "square" option for a rectangular column or leaving the shape on round for it. Only square and round are supported, and anything else is read as round.
- Ordering exactly the calculated amount. Add an allowance for spillage, uneven formwork and a reserve at the pour; the figure here is the theoretical volume.
- Relying on the bag count for a big pour; around 178 bags of 60 lb is heavy work, and the ready-mix volume is the figure to order from.
About this calculator
Pouring a concrete column means knowing exactly how much ready-mix concrete to order or how many bags to buy, and that comes down to a simple volume formula applied to the column's cross-section. For a round column, volume = π × radius² × height; for a square (or rectangular) column, volume = width × depth × height — multiplied by however many identical columns you're pouring.
The calculator converts that raw volume into the units contractors actually order in: cubic meters or cubic yards for ready-mix trucks, and the number of 60-lb bags (each yielding about 0.45 cubic feet of mixed concrete) for smaller jobs done by hand.
Contractors, DIY builders, and estimators use this before a pour to avoid the two costly mistakes of ordering concrete: running short mid-pour (creating a weak cold joint) or paying for truck minimums on far more than needed.
Was this helpful?
You can pick up to 3 reactions.
Popular calculators
Loan Calculator
Monthly payment, total interest and full amortization schedule.
Percentage Calculator
Percent change, percent of, and ratio calculations.
Discount Calculator
Calculate final price, savings, and discount amount.
BMI Calculator
Body mass index from height and weight (metric or imperial).
Age Calculator
Compute your exact age in years, months and days from a birth date.
Compound Interest Calculator
Calculate the final amount and interest earned with compounding.
All Calculators
- Loan Calculator
- Profit Calculator
- Discount Calculator
- BMI Calculator
- Percentage Calculator
- Ideal Weight Calculator
- Age Calculator
- Pregnancy Due Date Calculator
- Compound Interest Calculator
- BMR Calculator (Basal Metabolic Rate)
- Tip Calculator
- Fuel Cost Calculator
- Date Difference Calculator
- Sleep Cycle Calculator
- Daily Water Intake Calculator
- Simple Interest Calculator
- Heart Rate Zones Calculator
- Running Pace Calculator
- Pet Age Calculator
- Calories Burned Calculator
- Macro Calculator
- TDEE Calculator (Total Daily Energy Expenditure)
- Waist-to-Hip Ratio Calculator
- Honor Roll Calculator
- One Rep Max (1RM) Calculator
- Ovulation Calculator
- Electricity Cost Calculator
- Unit Price Calculator
- Savings Goal Calculator
- Break-Even Point Calculator
- Paint Calculator
- Course Grade Average Calculator
- Business Days Calculator
- Time Duration Calculator
- Fuel Economy Calculator
- Temperature Converter
- Tile Calculator
- Aspect Ratio Calculator
- Roman Numeral Converter
- Goal Weight Timeline Calculator
- Salary Converter (Hourly to Annual)
- Credit Card Validator (Luhn)
- Body Surface Area (BSA) Calculator
- Feels-Like Temperature Calculator
- Ohm’s Law Calculator
- PPI (Pixel Density) Calculator
- Molar Mass Calculator
- Zodiac Sign Calculator (Western + Chinese)
- IBAN Validator
- Shoe Size Converter
- Country Info & Dialing Code Lookup
- Time Zone Difference (World Clock)
- CAGR (Compound Annual Growth Rate) Calculator
- Rule of 72 Calculator
- Blood Alcohol Content (BAC) Calculator
- Lean Body Mass (LBM) Calculator
- Pythagorean Theorem Calculator
- Speed Converter
- Download Time Calculator
- Date Calculator (Add/Subtract)
No calculators found
Comments (1)
The shape choice changes the order noticeably when the same size number is used. A column with a 0.4 m size and 3 m height needs 0.377 m³ as a round column but 0.480 m³ as a square one, so check which formwork you are really building. Cardboard tube forms and timber boxes also differ in how well they hold the figure. For rectangular sections you must compute the volume by hand. What column sections are you pouring?