Scrap Rate Cost Calculator
Enter units produced, units rejected and unit cost to find your scrap rate and its cost.
Result
How it is calculated
The tool needs three numbers: produced (all units made in the run), rejected (units scrapped) and cost (cost to make one unit). It returns four results: scrap rate = rejected ÷ produced × 100, scrap cost = rejected × cost, good units = produced − rejected, and effective cost per good unit = produced × cost ÷ good units. The last figure spreads the whole run's cost over the good units only. If you enter more rejected units than produced, the tool caps rejected at produced. When every unit is rejected, good units are 0 and the effective cost is shown as $0.00 rather than an infinite value, so read it as not applicable. Produced must be above zero and the other two cannot be negative. Money is shown in dollars.
Worked example
A run makes 5000 units, 175 are rejected, and each unit costs 4.20 to make. Scrap rate: 175 ÷ 5000 × 100 = 3.50%. Scrap cost: 175 × 4.20 = $735.00. Good units: 5000 − 175 = 4,825. The whole run cost 5000 × 4.20 = $21,000, and dividing that by the 4,825 good units gives an effective cost of $4.35 per good unit, about 15 cents above the nominal 4.20.
Common mistakes
- Entering the good units in the produced field; produced must be the total before inspection, otherwise the rate comes out too high.
- Leaving out reworked units or counting them as scrap without deciding how they are treated; the tool counts only what you enter as rejected.
- Using the selling price instead of the cost to make one unit, which overstates the scrap cost.
- Comparing the scrap cost with the effective cost per good unit; the first is the loss on rejects, the second is the price each saleable unit really carries.
- Reading $0.00 effective cost as good news when 100% of the units were rejected.
About this calculator
The scrap rate in manufacturing is the share of units produced that fail quality inspection and get rejected — calculated as rejected units ÷ total units produced — and it's a core metric in Lean and Six Sigma quality programs because it directly measures how much of a production run is wasted material and labor. Multiplying rejected units by the unit cost gives the raw scrap cost, but the more revealing figure is the effective cost per good unit, which spreads that waste across only the units that actually passed inspection.
This calculator takes units produced, units rejected, and unit cost, then returns the scrap rate, total scrap cost, and the effective cost per good unit — the number that shows how much scrap is really inflating your per-unit economics. Manufacturing engineers, plant quality managers, and cost accountants use it to track process yield over time and to justify investment in defect reduction by putting a dollar figure on the current scrap rate.
Was this helpful?
You can pick up to 3 reactions.
Popular calculators
Loan Calculator
Monthly payment, total interest and full amortization schedule.
Percentage Calculator
Percent change, percent of, and ratio calculations.
Discount Calculator
Calculate final price, savings, and discount amount.
BMI Calculator
Body mass index from height and weight (metric or imperial).
Age Calculator
Compute your exact age in years, months and days from a birth date.
Compound Interest Calculator
Calculate the final amount and interest earned with compounding.
All Calculators
- Loan Calculator
- Profit Calculator
- Discount Calculator
- BMI Calculator
- Percentage Calculator
- Ideal Weight Calculator
- Age Calculator
- Pregnancy Due Date Calculator
- Compound Interest Calculator
- BMR Calculator (Basal Metabolic Rate)
- Tip Calculator
- Fuel Cost Calculator
- Date Difference Calculator
- Sleep Cycle Calculator
- Daily Water Intake Calculator
- Simple Interest Calculator
- Heart Rate Zones Calculator
- Running Pace Calculator
- Pet Age Calculator
- Calories Burned Calculator
- Macro Calculator
- TDEE Calculator (Total Daily Energy Expenditure)
- Waist-to-Hip Ratio Calculator
- Honor Roll Calculator
- One Rep Max (1RM) Calculator
- Ovulation Calculator
- Electricity Cost Calculator
- Unit Price Calculator
- Savings Goal Calculator
- Break-Even Point Calculator
- Paint Calculator
- Course Grade Average Calculator
- Business Days Calculator
- Time Duration Calculator
- Fuel Economy Calculator
- Temperature Converter
- Tile Calculator
- Aspect Ratio Calculator
- Roman Numeral Converter
- Goal Weight Timeline Calculator
- Salary Converter (Hourly to Annual)
- Credit Card Validator (Luhn)
- Body Surface Area (BSA) Calculator
- Feels-Like Temperature Calculator
- Ohm’s Law Calculator
- PPI (Pixel Density) Calculator
- Molar Mass Calculator
- Zodiac Sign Calculator (Western + Chinese)
- IBAN Validator
- Shoe Size Converter
- Country Info & Dialing Code Lookup
- Time Zone Difference (World Clock)
- CAGR (Compound Annual Growth Rate) Calculator
- Rule of 72 Calculator
- Blood Alcohol Content (BAC) Calculator
- Lean Body Mass (LBM) Calculator
- Pythagorean Theorem Calculator
- Speed Converter
- Download Time Calculator
- Date Calculator (Add/Subtract)
No calculators found
Comments (1)
Notice the gap between unit cost and the effective cost per good unit. With the default run of 1,000 pieces at 4.50 each and 25 rejected, each good piece effectively costs 4.62, because the scrapped pieces are paid for by the good ones. The tool treats scrap as a total loss at full unit cost, so any rework or resale value would reduce the real figure. Do you rework or sell your rejects?